There's the membrane. This whole process seems ridiculous to me,
 but this is according to experts...

 
A layer of mortar bed, a layer of mixed sand and cement,
then the membrane, and more cement. Crazy.

Getting this "membrane" in was more difficult than
 setting up a swimming pool. But there it is...
 
 
Terry's fighting with Greenboard.

 
Okay, we are ready for the cement floor now,
 which has to be poured and leveled on a slope to the drain, and
 carried up over the threshhold (which is encased with chicken wire),
one inch on top, and 1/2 inch on sides of threshhold.
 
This is just ridiculous. 