Friday, July 24, 2015

Day #35 Bath Redo

 
I took down the tape and we removed the plywood support...
 
and the mirror didn't fall off.
 
Time to frame this mirror.

 
I gave the wall board a final coat of paint,
and Terry worked on the base molding.

 
Almost done with the tile.

 
More painting...

 
This area is done and ready for a toilet.

 
Finishing the last of the wall board
was irritating.
This little corner gave us a headache.

 
Forgot to give Terry props for filling in this missing tile.

 
The final wallboards going in.
 
Hanging wallboard sucks.
 
I will never put it in a design plan again.

 
Finish details on the mirror frame.

 
Of course...
 
the walls and floor are out of level,
so I had to do some finessing
with the finishing of the mirror frame,
at midnite.
 
Looks good. I'm happy.

 
Got the wallboard up,
and painting tomorrow.
 
There are so many details to take care of,
tomorrow is Saturday.
 
We have two days, to go all in,
and get this done.
 
For now,
 
Goodnite house.

Thursday, July 23, 2015

Day #34 Bath Redo

 
Details, details, lots of details.
 
We glued the mirror on.
36" x 36" is a pretty good size mirror.
Still feeling nervous about it falling off...
 
It has to sit for 24 hours and then I can tile around it.

 
I gave the toilet a good cleaning,
and scraped all of the old caulk away from the bottom.

 
Terry sanded down door molding.

 
I cleaned the vanity,
and Terry anchored it to the wall.

 
Terry painted molding...

 
and when he tried to reinstall it,
we found a little problem.

 
Too big of a gap on the floor,
so now we have to bring this spot up to level,
and get out the tile saw again
 for some tiny little pieces.
 
Tomorrow is Friday,
and we're gonna work our asses off.
 
The new bathtub reglazing paint came today...
Can't wait to go for round two on that mess.

Wednesday, July 22, 2015

Day #33 Bath Redo

 
Wednesday.
 
Didn't get much done.
 
We felt old and tired today.
 
The one thing we got done
 was to build the frame around the mirror.
 
Now I can get to tiling it...
 
tomorrow.

Tuesday, July 21, 2015

Day #32 Bath Redo

 
I started out the morning
with some small stuff...
 
I hung a curtain rod.

 
I hung the towel rack up.

 
I cleaned all of the crap out of the bathtub.
(again)

 
Then I filled giant gaps in the wall with thinset.
 
I need a smooth surface for the mirror and tile.
 
(this will make sense later, I promise).

 
When Terry got home from work,
we started on the vanity.
 
It needed a new back panel,
and he had to cut the holes out for the plumbing.

 
We got it set into place...

 
and he worked on anchoring it to the wall.

 
Then we went and did some grocery shopping for mom,
and then we went to home depot for some stuff.
 
Paint, and outlet covers,
 and we picked up a toilet paper dispenser and a towel bar.

 
It's 11:00 at night,
and I'm drinking a beer and grouting the floor.

 
Looks good.
 
We are finally seeing a light at the end of this tunnel...

Monday, July 20, 2015

Day #31 Bath Redo

 
Wow, I had a high energy day today.
 
I grouted, I painted, I sanded, I cleaned.
 
I took care of so many little details in the bathroom,
the details that an invisible crew
 magically takes care of in TV remodeling shows. 

 
When Terry got home from work,
we ran up to Home Depot
 and got some more backer board for the mirror.

 
This is where the mirror will hang.
Terry will build me a frame around it,
and I will be tiling it.

 
Worked on this old window forever.
 
Terry cut me a little piece of molding for underneath...
 
Caulked and painted...
 
looks good.
 

 
Put a second coat of paint on the walls,
and the ceiling.
 
Love the color.

 
Finished painting the window frame.

 
Put a second coat of paint on the wallboards.

 
Finished off this corner,
where the tile meets the painted wall.
 
That one was tough,
but we figured it out.

 
A little more taping off, and painting,
of tricky transitions...
 
There's still so much to do.
 
I hope I wake up feeling the way I did today...

Sunday, July 19, 2015

Day #30 Bath Redo

 
We worked ALL day !
 
We took care of all kinds of little details,
and some big details.
 
We finally finished the remainder of the tiling.
Some areas could not be done
 until we matched up the wall boards and molding to it.

 
There were some tricky cuts around the window ledge,
but we got the wall board up.
 
These are tongue and groove pine boards,
that will be painted white.

 
Terry finished patching the walls
around the shower ceiling,
so I was able to put up the last of the tiles there.

 
Finally we can put away the tile saws,
 and all of the crap we needed for tiling.

 
Terry worked on refurbishing the bathroom door;
sanded it down,
 and is repainting it,
 and here he is scraping off
 50 years of paint layers from the hinges.

 
He hung the new light fixture.
 
(I'm not putting the glass covers on until the bathroom is done).

 
New molding around the window.

 
This confusing picture will be explained tomorrow...

Saturday, July 18, 2015

Day #29 Bath Redo

 
Today was Saturday,
and we were determined to get something done.
 
Back to hanging wallboards.

 
Finally found the right glue.

 
These pictures just look like a mess.
 
But we really are getting there...



Hanging "tongue & groove" wallboards.

 
Called it quits at 3:00...
 
Had to get ready for a wedding.

 
All cleaned up,
and ready to go.

 
My nephew Scott and his bride Jessica.

 
My nephew Kenny and his girlfriend Laura.

 
The bridal party.
 
Handsome bunch.

 
Sue, Bob, and Rob...
 
We revert back to children when we get together.
 
It was a good day.