Monday, July 6, 2015

Day #17 Bath Redo

 
Did two very important things today.
First, we finally got this wall together,
ready for tile, paint, and wallbard transitions.

 
This wall was such a mess,
there were to many levels of uneveness.
So, Terry just tore out the whole wall,
and we started fresh.
 
Didn't want to have to do that,
but it ended up a good thing.

 
All done, all even, and ready to go.

 
Second big thing we did was reglaze the bathtub.
 
This was a yucky job, but saved us hundreds of dollars.

 
First washing with special cleaner
 they give you in the kit.

 
Then scrubbing with fine steel wool.

 
I told him to stop taking pictures of my butt.

 
Second wash,
then steel wool scrub.

 
Third wash,
then steel wool scrub.
 
Ready for paint.

 
Terry had to do this task.
The fumes were so bad,
I could hardly stand it in there
 for more than a couple minutes at a time.

 
The spray can is dripping badly at this point.
 
You have to catch the drips right away.

 
The first coat is done.
Wait 15 minutes and start the second coat.
 
By this time the kids are
complaining wildly about the smell.

 
The second coat went alot better than the first.

 
There it is,
showroom new...
 
now three days of curing time.

Sunday, July 5, 2015

Day #16 Bath Redo

 
My brother loaned us his heavy duty tile saw
(thank goodness).
But we won't be needing this for a few days.

 
Here's the new doorway threshold,
we need to prep for.

 
Broke out the mortar bed...

 
Laid some plywood.

 
Then we laid the backerboard,
starting at the back of the bathroom,
working our way to the door.

 
Thinset under backer board.

 
When we got to the dorway,
the threshold did not fit.
 
After multiple trial runs
 and making sure everything fit just right,
it still didn't fit right.
There was a lot of cursing,
 and a lot of recutting,
 and finally everything came together.
 
Everything ends up being so difficult and time consuming.

 
This was the arch over the shower.
We had to fill this in with some backer board.
 
More special cuts and sizing,
 
more taping and thinset.
 
 
Taped and mudded this corner section.

 
The floor is ready for tile.

 
This wall still needs a lot of work.
 
We are in the nitty-gritty ugly part of this now.
There are so many little details to work out,
and every one seems to pose a unique new challenge.
 
We are exhausted and frustrated,
but this isn't our first rodeo.
 
We will get through this.
 
Tomorrow is the big bathtub reglazing job.
 
yea.

Saturday, July 4, 2015

Day #15 Bath Redo

 
Terry was up first thing this morning
 cutting backer board for the bathroom floor.
 
Stopping to pick weeds along the way.

 
He got the whole floor laid.

 
3:00 time to quit
and go spend the evening
out at Bob's for Fourth of July festivities.

 
Couldn't believe all of the hummingbirds
 he has around his house.

 
We tried to relax on the hammock...

 
I almost dozed off.

 
The guys are way out there in the dark somewhere
 setting up the fireworks.

 
It was a pretty awesome display.

 
Bob being silly after the fireworks.
He only lost a couple of fingers.
 
It was a good day.
Good to get away from our bathroom work for a while.

Friday, July 3, 2015

Day #14 Bath Redo

 
Hit it hard today.
 
Started out hanging backerboard in the tub/shower.

 
Those boards are heavy.

 
Terry knows his way around a tape measure...

 
Attached the "niche" with silicone.

 
Got all of the backerboard up.

 
Terry taped and thinset all of the seams.

 
Tomorrow, we need to figure out
what to do about this weird transition wall...

 
The reglazing of the bathtub job is looming large...

 
New transition plate needs to be laid...

 
Somehow,
Terry found time to fix the garage lights,
 and he mowed the lawn.

 
It's that time of the night...
we are sitting out back,
 planning for tomorrow,
 but tonight,
we get to see some fireworks too. 

Thursday, July 2, 2015

Day #13 Bath Redo

 
Terry worked a half day today,
 (which is really 7 hours since he worked from 5 til noon).
 
When he got home we drove out to the plumbing store
 to figure out what to do about the bathtub plumbing.
 
We found some nice fixtures
that work with the 65 year old plumbing.

 
The plumbing took longer than expected,
because we decided that the shower head should be raised.
 
 
Shorty wanted to see what was going on...

 
We raised the shower head up six inches...
seemed like the right thing to do.
 
Even though we are short,
future tenants might be tall...

 
We tested the plumbing to make sure there were no leaks.


 
Finally ready for the plastic vapor barrier.

 
With that done,
we hung our first slab of backerboard.
 
Then the battery for the drill died,
so while it recharged
Terry cut the hole for the niche.

 
At ten p.m. we lit a small fire and
talked about what we need to accomplish tomorrow.

 
There's the niche insert.

I am going to HATE tiling this thing...
 
Tomorrow,
we hang the rest of the backer board.

Wednesday, July 1, 2015

Day #12 Bath Redo

 
Terry worked all day
 and then we some shopping for mom.
 
Not much got done in the bathroom.
We cut and fitted some insulation
 on the exterior wall of the shower.
 
After tomorrow, Terry has four days off,
and hopefully we can get something done in here.