Slow but Steady Progress

 
This is going to be a very slow porject.
 But, that's olay because there are still two functioning bathrooms
 in the house, so it's not like we have to use
 the Mobil station down the street or anything...

 
Terry is starting to put up walls, and at the same time,
still removing some old wood, and plumbing, and electrical stuff.

 
More demolition garbage !!!

 
While Terry bangs away downstairs, I am crocheting.
I haven't picked up the crochet hook in a long, long time,
but my little Sandy asked me to make her a blanket,
so here we go...
She picked out the pattern... I only need 70 squares. Ugh.

 
Ahh, family time.
Sister Sue came home for a visit, and we had some silly time.

 
Me & Terry had silly time too.

 
Back to the basement...
We (Terry) tore out the wall under the stairs.
(That's the sump pump back there)

 
Tonight, we layed out where the shower will be,
and made sure there was ample toilet space.
 
Tomorrow, Terry will work on framing in the walls, and the shower.