Wednesday, April 8, 2015

Project 2 & 3

 
Project 1 was the half bath upstairs, and we finished that, so we moved on to project 2, which was to redo the base molding throughout the main floor of the house, and Terry ripped out all of the molding, but then we realized that the molding was kind of tied into project 3, which is buffet cabinetry in the dining room,
so now we are doing project 3 first......... 
 
I removed the china cabinet and the shelving along the wall,
 and terry is building the kickplate for the cabinets.

 
Just a small base frame to raise the cabinets up off the floor.

 
There's the base frame.
The giant hole filled with insulation is the space that housed the old radiator.

 
Got a great deal on unfinished cabinets.
 They were 25% off, and we got one 36 in. (2) 24 in. and (2) 18 in. cabinets for $200.
 
They are supposed to be upper cabinets,
 but due to the small depth allowance, we had to use them,
and we will transform them into a wall of storage.

 
Confused?
Just wait, it's gonna be awesome.
 