Monday, July 13, 2015

Day #24 Bath Redo

 
Oh man, grouting the ceiling sucks.

 
Good thing I am ambidextrous...

 
My neck is starting to ache.

 
That's done,
now I have to finish the front...

 
I'm wrapping the tile over and up the outer wall,
to give the illusion of a taller ceiling
 and over all, more space.

 
Roxy is always nearby...

 
Terry continues his patching,
second coat.

 
There is more patching here too,
so I can't finish the tiles 
in the corners until it is dry.

 
Tomorrow we lay the floor.

Sunday, July 12, 2015

Day #23 Bath Redo

 
I jumped right in...
grouting the shower niche.

 
While Terry tried to figure out this mess.

 
He had to move the electric wiring.
 
There were lights on each side of the mirror,
and now there will be a single lighting
fixture over the mirror.

 
He's got a lot of patching to do.

 
This wall is a mess !!!

 
After buying a larger mirror than was here,
Terry had to bust out more mortar bed.
 
I'll explain this more later... 
 

 
Team grouting effort.
 
Still have to do the ceiling,
I don't like grouting the ceiling.

Saturday, July 11, 2015

Day #22 Bath Redo

 
Today, we started where we left off.
We finished tiling the shower walls,
and that went smoothly.

 
Big huge thank you to brother Bob
 for lending us his tile saw.
 
 
This was a difficult spot
 for Terry to cut perfect pieces of tile...
 
One on each side of the tub.

 
I got to work on the ceiling...

 
It's mid-afternoon, and I am on a roll. 


I finished after dinner,
and Terry hung the light
 just so we could see how it would look.

 
It looks awesome,
we are pretty proud of ourselves.
 
(Not looking forward to grouting all of this).

 
Terry broke out the paint,
and did a first coat.
 
Beautiful Gray, Mossy Green color.

 
He's cleaning up,
at 11:30 at night.


There's the perfect pieces,
next to the tub, he cut today...
 
Speaking of the tub,
the reglazing turned out awful;
gritty, bumpy, poor coverage, and scratches right off.
and we are trying to figure out what to do about that...
 
Ugh.

 
Just got finished brainstorming about this wall.
 
This is where the vanity and mirror go...
 
This is going to be a challenge,
and I will talk about it later.
 
Tired, but good tired.

Friday, July 10, 2015

Day #21 Bath Redo

 
Friday...
The minute Terry got home from work,
we started rolling.

 
So many special cuts...

 
Terry's workshop.

 
Cutting the holes for the fixtures.
(It looks like he has no legs).

 
Hanging the soap dish.

 
It's 11:30 and we had to quit
 because we ran out of tile.
 
Damn, two rows to go and we have to go find some more tile,
because our Home Depot doesn't have anymore.
 
Road trip.

Thursday, July 9, 2015

Day #20 Bath Redo

 
We've talked and talked and talked
 about this shower niche,
and we finally came up with a plan...

 
Time to get moving.

 
The first piece is always the hardest.

 
Here's where some finesse is needed.
 
I ended up cutting the tiles off
 of the 12 x 12 mesh backing
 in order to set each piece in individually.
 
It's the only way to get it all square,
 and tiles evenly placed.

 
Looks good.
Ready to tile the rest of the shower tomorrow.
 
Here comes the weekend...

Wednesday, July 8, 2015

Day #19 Bath Redo

 
Today was Kevin's birthday.
Yes, that's my 25 year old son,
and his hair.
 
He's been growing it for a couple of years,
and today he got a birthday haircut.
 
(His decision, of course).

 
I didn't do anything drastic,
just 12 inches or so.
 
He's so cute,
doesn't like his picture taken.

 
Terry felt sick when he came home from work,
he's so exhausted.
 
Tonight I primed the wall boards,
so they are ready to go.
 
That's all for today.
 
We still have one more day of the
bathtub paint curing,
then we can start tiling.
 
Happy Birthday Kev!
 
 

Tuesday, July 7, 2015

Day #18 Bath Redo

 
It's day 1 of the three days
 the bathtub reglazing needs to cure,
so we are going to get
some other things done while we wait.
 
 
We returned this tile to Home Depot,
and took a ride out to a real tile store.
 
(I decided that it was way too expensive,
and not very good quality).

 
Here's the tile we chose,
half the price,
and I like it even more.
 
(This tile is just for the ceiling).

 
After dinner,
 we went to Home Depot for this and that...
 
and Terry couldn't pass up free stuff,
bags of open mortar and a work bench.

 
There's the paint,
"Winter's Day"

 
Base molding left over from
other projects.
 
 
Here's all the wall board,
 that needs to be primed and painted.

 
Floor tile.

 
Wall tile.
 
Everything just sitting here waiting...
 
We want to get back to work.